It seems that my optimism a week ago was misplaced as far as Lennar’s progress with our new home is concerned! I wrote “electrical wiring finished now, and preparations for exterior stucco progressing rapidly”, but a week later, there’s been little change from that position.
Inside, there’s been a few small steps – including framing the false wall in one upstairs closet that hides the AC ducts:
Inside too, a “second phase” of electrical wiring was completed this week – alarm pre-wiring which brings sensors to the downstairs windows and doors (as well as a bundle of wires in an upstairs closet); but at the same time, the main electrical wiring apparently failed inspection, which then delays any possibility of interior insulation, sheetrock, etc! I don’t know the failure details, but there’s some evidence with a removed exterior power outlet on the rear patio:
In the same area at the rear of the home, the upstairs deck has been partially framed – though it’s missing a few horizontal beams:
Unfortunately it looks like the rear deck has cracked some of the block wall, so perhaps that’s a reason why the exterior stucco hasn’t happened yet:
In addition, a big reason for slow progress this week is the two homes either side of ours – both of them are supposed to be sold this week, so a big push to get them completed makes it obvious that the construction focus moves away from our new home. Luckily, we can be patient!
Hopefully when the 2 houses next to you will be done they will be able to focus just on yours and you might see very quick progress.
Yes, our hope too!