A slow month at Stanton Estates

Progress seems surprisingly slow over the last month on our new home – at least partly because the recent work included all the electrical wiring, and there’s a lot of it!

At the end of last month, most of the windows were installed, and the huge sliding doors at the back – though the big one in our future master bedroom was missing (and is still missing today!). Today, our visit showed us that the front doors have been installed (and also the “cabana door” to the back, which will one day have a cat door for Chloe:

The last month also included further plumbing work, along with all the electrical wiring; progress at the future fuse panel gives an idea:

 

Today we also found a huge pile of roof tiles in front of our home; a long way to go till they’re installed on the roof though:

Shiny Stanton

Over the last week there’s been slow but steady progress, especially in the theme of adding shiny stuff to the interior – because the interior walls are mostly framed in steel, and because the a/c ducting is being installed. Pictures of course:

Today’s visit found most of the windows installed, and the second phase of plumbing begun – more progress!

 

Stanton stairs!

On our visit to Stanton Estates today, we found stairs as well as a fully covered roof!

And stairs gave us our first view of my future office space:

We spoke to site supervisor Alexy, and learned that the next week should bring windows, interior framing, and the beginning of plumbing and a/c ducting!