Covering the walls at Stanton Estates

Over the last week there’s been more progress at our new home – the walls have been “covered” both outside and inside! Outside there’s now stucco on all the walls, and inside (finishing off when we visited today) there’s sheetrock / drywall that makes it easy to see the sizes of rooms – no more peering through the framing!

Also today, the travertine tiles were being laid around the pool.

What’s left? Outside, the roof tiles need to be placed, then it’s mostly just painting – and stonework at the front. Of course there’s also all the landscaping. Indoors, the list is much longer, with tiling the bathrooms, installing cabinets especially in the kitchen; flooring, painting, and so much more …

 

One thought on “Covering the walls at Stanton Estates

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s