Yesterday and through the night, we filled the pool; today Atlas Pools returned to finish installing the plumbing fixtures, and set the pump running. They also put chemicals in the water, which sadly mean we can’t go in till at least Sunday – but it’s pretty, and with the pump running, we get to see the bubbler jet and “sheer descent” waterfall!
I also put together a build sequence video – with “action” flowing water from the two minutes point …